Deformation of mining caving zone grouting compound rock under overlying strata pressure
(1.The Research Center of Mining Damage and Control Engineering,Liaoning Technical and University,Fuxin 123000,China;
2.School ofMines,China University ofMining&Technology,Xuzhou 221008,China)
Abstract To solve the problem of surface subsidence caused by mining,the main methodis to reasonably process coal mining space.“Mining caving zone high—pressure groutingpulverized coaI ash hydromass controlling roof and overlying strata movement""technologyis one of processing methods.After grouting pulverized coaI ash hydromass in miningcaving zone,formed one kind of special materia1 which is used to support roof and efectivelycontroI the subsidence of overlying strata.For the accurate calculation of roof miningsubsidence at grouting state,based on the characteristics of such materials,establishedits constitutive equation based on certain assumptions。gave deformation calculation method when the compound ro ck supports overlying strata.1ay foundation for the actuaI
calculation of subsidence of overlying strata after grouting and the promotion of mining ca ving zone grouting technology.
Keywords mining caving zone,grouting,compound rock,compression quantity,overlying
rock controlling
lntroduction
Surface subsidence caused by mining not only damages the ecological environment in mining area,but also damage building and structures on ground surface and causes seriOUS security risks.The main method to solve these problems is to reasonably proc. ess coal mining space.Different from the traditional method of goaf hydraulic stowing,broken rock grout-
ing and metal mining field paste body grouting,some scholars propose “mi ning caving zone high—pressure grouting pulverized coal ash hydromass controlling roof and overlfing strata movement""technologyl to control the movement of roof and overlying strata then proceed to reduce surface subsidence.The basic men.tality of this technology is to design a subcritical exaction working surface in mining zone.Extract a grouting gallery over the caving zone which is parallel to road serving for working face,and arrange centralized grouting tube in grouting gallery over the caving zone.Drill hole in rock every certain distances deep into caving zone.The drill hole in rock is ve~ical to grouting road.It can grout into caving zone with the working surface moving forward.As a result,com.pound rock is formed to support the roof then control the movement of overlying strata.
Therefore,the roof control quantity is compres.sion quantity of compound
rock after caving zone grouting,so it is essential to study on the deform ation under overlying strata pressure during the process of overlying strata.
1 Establishment of compound rock material response function
1.1 Analysis of basic principle Caving zone is formed after roof collapsed
caused by mining.Assuming that the crack is filled with hydromass. cracking zone is form ed and forms special compound rock beam after injecting.A constitutive model of general beam is not suitable for the special compound rock beam because of the ingredient of it is specia1.The Paper is based on the energv viewpoint,and the strain energy of the beam is relative with the stress and inner damage.Based on it.Assumption about the compound rock beam is made as fol—
lows.① A compoun d rock beam is formed after sprouting in the broken rock zone:②The beam is made of a kind of super elastic isotropous material 还有一半发布上来
采矿崩落区注浆变形复合岩层上覆地层压力之下
(1 .研究中心及控制工程采动损害,辽宁阜新123000技术和大学,中国。
2.School ofMines,中国大学ofMining&Technology、徐州221008、中国)。
摘要为解决这一问题的开采引起的地表沉陷,主要methodis合理工艺开采煤炭开采的空间。”groutingpulverized开辟区coaI灰hydromass控制高压的屋顶上覆岩层运动”,methods.After注浆法加固处理纯之一,在miningcaving hydromass喷coaI灰分形成的区域,一种特殊的materia1用来支撑屋顶和efectivelycontroI上覆strata.For沉降的精确计算的屋顶在灌浆状态,miningsubsidence特点的基础上,establishedits等材料的本构方程,基于某些assumptions.gave变形计算方法的复合ro对照(ck)时strata.1ay豪基金会支持actuaI
对上覆岩层的沉降计算后注浆和促进矿业ca面积区注浆技术。
关键词采矿崩落区、注浆、复合岩、压缩量、覆
岩石控制
台州市
开采引起的地表沉陷不仅损害了矿区生态环境的破坏,而且对地表建筑物和结构,造成了严重的安全risks.The解决这些问题的主要方法是合理proc. ess煤矿space.Different从传统的方法、破碎的岩石采空区液压害羞浆液-
和金属矿山现场膏体灌浆,一些学者提出了“mi宁崩落区高压灌浆煤粉灰hydromass控制顶板岩层运动”,overlfing technologyl控制运动的屋顶上覆地层,进而降低表面subsidence.The这种技术的基本men.tality是设计一个亚临界严绳工作表面zone.Extract矿区注浆画廊在放了平行于路区,并服务于工作面的注浆管布置集中在灌浆画廊的岩石洞峡zone.Drill每天一定距离,深入zone.The放钻孔在岩石是对注浆road.It已经~直通式能装进崩落区与工作表面的结果,com.pound移动forward.As岩石形成支撑着屋顶然后控制运动的上覆岩层。
因此,compres.sion顶板控制量的数量
岩石,所以放区注浆是必要的情况下的变形研究上覆地层压力的上覆地层的过程中。
1建立复合材料响应函数
11分析的基本原理,放区后形成屋顶崩塌
mining.Assuming引起的裂缝是充满hydromass.开裂区和形式的特殊形式injecting.A复合岩层的本构模型后,一般梁并不适合这个特殊的复合岩层的成分的光束是specia1.The纸是基于energv观点、应变的梁与应力和内部相对于it.Assumption damage.Based对复合岩体梁作为信徒-
一个compoun低点。①d岩石后形成波束半夏居破碎岩石地带:②光束是一种超弹性isotropous还有一半发布上来材料
- 黑桃云
-
采矿崩落区注浆变形复合岩层上覆地层压力之下
(1 .研究中心及控制工程采动损害,辽宁阜新123000技术和大学,中国。
2.School ofMines,中国大学ofMining&Technology、徐州221008、中国)。
摘要为解决这一问题的开采引起的地表沉陷,主要methodis合理工艺开采煤炭开采的空间。”groutingpulverized开辟区coaI灰hydromass控制高压的屋顶上覆岩层运动”,methods.After注浆法加固处理纯之一,在miningcaving hydromass喷coaI灰分形成的区域,一种特殊的materia1用来支撑屋顶和efectivelycontroI上覆strata.For沉降的精确计算的屋顶在灌浆状态,miningsubsidence特点的基础上,establishedits等材料的本构方程,基于某些assumptions.gave变形计算方法的复合ro对照(ck)时strata.1ay豪基金会支持actuaI
对上覆岩层的沉降计算后注浆和促进矿业ca面积区注浆技术。
关键词采矿崩落区、注浆、复合岩、压缩量、覆
岩石控制
台州市
开采引起的地表沉陷不仅损害了矿区生态环境的破坏,而且对地表建筑物和结构,造成了严重的安全risks.The解决这些问题的主要方法是合理proc. ess煤矿space.Different从传统的方法、破碎的岩石采空区液压害羞浆液-
和金属矿山现场膏体灌浆,一些学者提出了“mi宁崩落区高压灌浆煤粉灰hydromass控制顶板岩层运动”,overlfing technologyl控制运动的屋顶上覆地层,进而降低表面subsidence.The这种技术的基本men.tality是设计一个亚临界严绳工作表面zone.Extract矿区注浆画廊在放了平行于路区,并服务于工作面的注浆管布置集中在灌浆画廊的岩石洞峡zone.Drill每天一定距离,深入zone.The放钻孔在岩石是对注浆road.It已经~直通式能装进崩落区与工作表面的结果,com.pound移动forward.As岩石形成支撑着屋顶然后控制运动的上覆岩层。
因此,compres.sion顶板控制量的数量
问题补充:2研究岩石的变形pressur上覆岩层化合物
讨论是关于establishm复合材料的纵向响应函数在一定假设sprouting.To合理计算后放区上覆岩层移动的需要
知道了变形的复合rock.Actually抑郁症的运动情况是弯曲变形的变形的超级弹性compoun d岩石梁。
建立关系bendin 2.1力矩和defleetion。
为了获得之间关系的弯矩和变形是属于纯时刻的问题,首先建立如下(Figs.1和2TM)。
(图)图超弹性复合岩体梁
(图)的量程截面的应力分布
几何情商。(5)是由于该平面假设仍是正确的。(公式)的挠度、z是z轴方向;p点的曲率半径的中央的水平。
- 再也不做稀饭了
-
变形的综采放顶区注浆复合岩石上覆岩层压力
( 1 ,研究中心的采动损害与控制工程,技术和辽宁大学,辽宁阜新十二点三○○万,中国;
2.School ofMines ,中国科技大学ofMining ,徐州221008 ,中国)
摘要为了解决这个问题的地面沉降造成的挖掘,主要methodis合理煤炭开采过程中的空间。 “综采放顶区高压groutingpulverized coaI灰hydromass控制顶板和上覆岩层movement""technologyis一个处理methods.After灌浆煤粉coaI灰hydromass在miningcaving区,形成一种特殊materia1这是用来支持屋顶和efectivelycontroI沉降覆strata.For精确计算的屋顶miningsubsidence在灌浆国家的基础上,这种材料的特点,基于establishedits本构关系某些假设。给予变形的计算方法时,复合反渗透对照支持覆strata.1ay基金会actuaI
计算沉降后覆岩注浆和促进采矿加州文区注浆技术。
关键词综采放顶区,注浆,复合岩石,压缩数量,覆
岩石控制
lntroduction
地面沉降造成的开采,不仅破坏生态环境,在矿区,但也损害建设和结构对地表和造成严重安全risks.The主要方法来解决这些问题是合理的进程。鼻窦采煤space.Different从传统方法的液压充填采空区,破碎岩体灌浆
荷兰国际集团和金属矿业领域机构灌浆粘贴,一些学者提出“美宁放区高压灌浆粉煤灰hydromass控制车顶和overlfing阶层movement""technologyl来控制的移动屋顶,覆岩层然后开始减少地表下沉。基本men.tality这项技术是设计一个临界勒索工作面采矿zone.Extract一灌浆画廊区的放是平行的公路服务的工作面,并安排集中注浆管注浆画廊的放区。岩石钻孔一定距离每放zone.The深入岩钻孔是维生素E u301c iCal中以灌浆road.It可以放区注浆成与工作表面移动forward.As因此, com.pound岩石组成支持屋顶然后控制的移动覆岩层。
因此,顶板控制数量压缩量的化合物
问题补充: ③次应变能密度函数的梁正义
应变张量function.Then它可以推断材料响应函数复合岩梁。
1.2建立复合岩石材料响应函数
从假设③ ,我们可以推断出应变能密度函数的复合岩梁模型是u = ( ) ,它可以表达的三个应变张量:
(中间公式只有几句:正定的物质反应的功能1 2 3
一个审计satisfiesthe关系。假设均衡器。 ( 1 ) ( )是四个multino -
信箱,可以表达的超弹性约束
结构理论方程:以均衡器。 ( 3 )均衡器。 ( 2 ) ,使格A1 = ... 。
canbe获得: )
FromEq 。 ( 4 ) ,我们可以inferthatthe建立
材料响应函数( ... )的表达
依赖于establishm耳鼻喉科的B1 ,素B2 , u22ef ,而9的B9独立材料常数吨可能获得的实验方法。